There is no fixed minimum order quantity. Every part — including the standard parts in our catalogue: brass inserts, nuts, hex standoffs, screw plugs and tube-fitting components — is made to order, so the sensible batch size is a question of run economics: set-up time, bar usage and inspection are spread over the pieces in the run.
That is why we quote the batch from your drawing or part number together with your annual quantity, and show you the price at two or three quantities so you can see where the unit price settles.
For sample orders — which we actively encourage for new customers doing supplier qualification — we produce a small first-article batch ahead of the series. The purpose of samples is to let you physically test, measure, and confirm fit before committing commercial volume. Don't skip this step; it protects you and us.
If new tooling is required (dies, form tools, special thread taps), it is quoted as a separate line rather than buried in the per-unit price. One thing that trips buyers up: they negotiate a very small first order as a trial and then discover that re-ordering at that size isn't economical for ongoing supply. Plan your first order with an eye on what your replenishment cadence will look like — it makes the commercial structure more honest for both parties.
Lead time is probably the most mismanaged expectation in cross-border manufacturing procurement, so here is the honest breakdown rather than the optimistic one.
First purchase order: Plan for 6–8 weeks from order confirmation. This allows for material procurement (we don't hold speculative stock of every alloy grade), production scheduling, manufacturing (series production typically runs 3–5 weeks from the approved drawing), quality inspection, documentation preparation (CoC, packing lists, export docs), and booking logistics. If your order requires new tooling for custom features, add 3–4 weeks to that.
Repeat orders: every part is made to your print and against your order — we hold no speculative stock — so a repeat order runs like any series order, typically 3–5 weeks; programs, tooling and gauges already exist, which removes the first-article stage. For repeating demand, the way to take lead time out of your planning is a blanket order with scheduled releases: we plan material and machine capacity against your schedule — and, because the blanket order covers it, we can hold buffer stock, so a release ships in about 2–3 weeks.
Urgent / expedited orders: We can expedite standard items with premium scheduling for delivery in 3–4 weeks. This involves pre-empting other production orders and carrying a premium, which is applied transparently. Air freight replaces sea freight. The cost is real — but so is the cost of a production line stoppage.
Our practical advice: never plan a first order to arrive just-in-time against a launch deadline. Always buffer the first purchase by at least 3 weeks. The second order can be optimised. The first is where you learn the rhythm.
Requesting samples from us is deliberately simple — because we believe in letting the product make the argument before the salesperson does.
The process: send us an email or use the contact form at brassland.com/contact with: the product reference or a description of what you need (fitting type, nominal size, alloy, thread standard), the quantity (typically 5–20 pieces is enough for evaluation), your shipping address, and a brief description of the application. We respond within 24 hours (working days) with a sample quote and a pro-forma invoice.
Sample costs: we charge our standard per-unit manufacturing cost for samples — we don't inflate "sample pricing" as a revenue line, and we don't supply free samples to every enquiry (that model doesn't scale honestly). Shipping is billed at cost. For qualified OEM or distributor accounts placing meaningful follow-on orders, we credit the sample cost against the first commercial PO.
What to do with samples when you receive them: measure them. Don't just look at them — put them on a CMM or a bench micrometer. Thread gauge them. Fit them to your tube or pipe. Pressure-test them if your application warrants it. A sample evaluation that doesn't involve functional testing is just a visual inspection, and visual inspections don't catch the failures that matter.
Timeline: samples — catalogue parts or parts to your drawing — are produced as first articles, typically 3–4 weeks from the approved drawing or specification.
A well-structured RFQ is the fastest route to an accurate quote. Here is exactly what saves time and what creates delays — because unclear RFQs are the single biggest source of commercial friction in cross-border procurement.
For standard catalogue items, provide: product type (e.g., threaded insert, hex standoff, screw plug), nominal size(s), alloy grade required, thread standard (BSP/NPT/metric), surface finish, certification requirements (WRAS, NSF, WaterMark etc.), annual quantity forecast, target delivery location, and Incoterms preference. That covers 80% of what we need.
For custom or OEM components, additionally provide: a 2D engineering drawing in PDF plus DXF/DWG/STEP format, tolerances for critical dimensions marked as KPCs, material specification by alloy designation (not just "brass" — CW617N, CW602N, etc.), surface finish requirements (Ra value or description), any certification requirements that apply specifically to this component, and target price if you have one. We can work within a target cost — but we need to know it.
What causes delays: vague specifications ("similar to this sample"), missing thread standards, and — most commonly — undeclared certification requirements that we discover after quoting a standard item. If your end customer requires WRAS approval and you don't mention it at RFQ, the quote you get is wrong. Certification capability affects alloy choice, manufacturing process, and documentation overhead.
We typically respond to a well-formed RFQ within 24 hours with a formal quotation. Incomplete RFQs get a clarification request first — which adds a day or two.
We sell directly — there are no agents in the middle and there is no distributor network. Brassland makes every part to the customer's print and against the customer's order, and we hold no speculative stock, so there is nothing on a shelf for a stockist to resell.
OEMs and system integrators: We deal directly. The relationship typically involves custom components made to your specification, with your part numbers and markings. We sign NDAs and treat your product designs as confidential. For larger programmes we agree a framework covering pricing, quality requirements and tooling ownership before first production.
Distributors and trading companies: You are welcome as a customer on exactly the same basis as an OEM — your drawing or specification, your order, your brand if you wish. We do not appoint regional stockists, and we do not hold stock for resale.
End users and contractors: If you're buying for your own use or a specific project — not for resale — we're happy to deal directly above our minimum order values. We don't require you to be a registered business, but we do require clear shipping and payment details for export documentation.
Yes — and this is one of the genuine advantages of working with a manufacturer who covers multiple materials and product types. Consolidating your supply chain reduces your administrative overhead, simplifies your CoC documentation, and typically improves your shipping economics.
A single Brassland PO can include: brass inserts and other standard parts, turned and milled brass components to drawing, machined forged-brass parts, copper (C11000) contacts and terminals, and aluminium (6061 / 6063) components. Each product family has its own production process within our facility, but they share one quality system, one documentation process, and one outbound logistics operation.
For mixed orders, we issue one Master CoC per PO that references individual product-level CoCs for each line item. Customs documentation consolidates the HS codes across the shipment. We handle the complexity so you receive one clean shipment with a complete, organised document pack.
The practical limit: if your order includes items with significantly different lead times — say, standard catalogue fittings (4 weeks) and new custom-tooled components (10 weeks) — we discuss whether to ship in part-lots or hold for consolidated dispatch. We'll always recommend what's operationally sensible and give you the choice. For supply chain continuity, shipping the lines that are finished first while the longer-lead items follow is often the smarter move.
Non-catalogue requests are the core of what we do: most of our output is components made to customer drawings.
The process starts with a conversation or an RFQ with a drawing. We assess three things: material feasibility (can we make it in the alloy you need?), manufacturing feasibility (can we hold the tolerances on our equipment?), and economic feasibility (does the volume justify the tooling investment?). We're honest about all three. If something isn't feasible on our equipment, we'll tell you — not take your deposit and come back with excuses six weeks later.
For machined custom parts, we typically need: a dimensioned 2D drawing in PDF/DWG, a 3D model in STEP or IGES format (strongly preferred — it eliminates interpretation errors), clear callout of critical dimensions, and material specification. We return a DFM (design for manufacturability) review within 5 working days, which flags any features that are difficult to machine as drawn and suggests alternatives that achieve the same functional result at lower cost.
Tooling for special features — form tools, broach patterns, thread gauges, custom fixtures — is costed separately and ownership terms are agreed upfront. On dies for forged parts, tooling investment is significant and we agree an amortisation schedule per piece that balances your first-order cost against long-term economics.
Bottom line: if your engineering team has drawn a turned or milled part in brass, copper or aluminium within our Ø2–150 mm bar range, there is a good chance we can make it — and we will say so quickly if we cannot.
Yes — against a blanket order. Brassland makes to print and to order and holds no speculative stock, but when you give us a blanket order we can build and hold buffer stock of your parts against it.
Here's how it works: you issue a blanket order — typically for 12 months — with a release schedule. We buy material, plan machine capacity and pre-manufacture ahead of your releases, holding the finished parts at our Jamnagar facility as your buffer. When a release is called, we're not starting from raw material — we're picking from buffer stock, doing a final inspection, and shipping. Lead time for the release drops from the 3–5 weeks of a made-to-order series run to about 2–3 weeks, which is mainly export preparation and logistics.
The buffer is built only against your blanket order: the stock is committed to you, and the order defines what happens to it if your demand changes. Without a blanket order, every batch is made to order. Pricing is better too, because we can plan production runs efficiently.
One honest caveat: buffer stock works for predictable, repeating demand. If your ordering is irregular — 2,000 pieces one month, nothing for three months, then 5,000 — buffer stock planning is difficult. In that case, the better solution is discussing your demand shape with us so we can design a supply model that fits, rather than a model that sounds good in a brochure but fails in practice.
Absolutely — and we encourage it. Factory visits separate genuine manufacturers from trading companies faster than any document audit, and if you're qualifying us for significant volume or a regulated application, a site visit is both appropriate and professionally responsible.
We host supplier audits regularly from European, American, and Australian customers. A typical audit day covers: facility tour (machining shops, QC laboratory, packing and warehouse — forging is done at our partner's plant), review of ISO 9001 QMS documentation (quality manual, process procedures, calibration records), witnessing live production if timing permits, review of current customer quality performance data (DPPM, OTD, NCR trends), and a technical discussion with our engineering and quality teams.
We don't script audit days. You'll see what's actually happening on our floor that day — not a prepared showroom. If something isn't perfect, we'd rather you see it and discuss it than pretend our operation is flawless and lose your confidence the first time something goes wrong.
Practical arrangements: Jamnagar has its own airport with flights from Mumbai (a little over an hour); Rajkot is the nearest larger airport. We recommend planning a full day on-site and can assist with hotel recommendations in Jamnagar. Give us 2 weeks' notice and we'll prepare the documentation package you want reviewed in advance so your audit day is substantive rather than spent waiting for files. Remote virtual audits via video conference are also available for customers where travel isn't feasible — we've conducted these successfully with customers in Germany, Australia, and the USA.
On-time delivery is the metric that tells you more about a supplier's operational reality than any certification document. We publish ours rather than hide behind qualitative claims.
Our trailing 12-month OTD rate for confirmed POs is 94% measured against the committed ship date. For customers on a blanket order with buffer stock, OTD is above 98% because releases ship from pre-built stock. The 6% miss rate on new orders is predominantly caused by raw material supply delays (brass rod and copper tube pricing and availability spikes) and, occasionally, by quality holds where we choose to miss a deadline rather than ship non-conforming product. We will always call the latter clearly — a delay notice with an explanation is better than a conformity certificate that covers up a problem.
When we know a delay is coming: we notify you within 24 hours of identifying the risk, not on the day the shipment was supposed to leave. You get a revised date, the root cause, and our corrective action. If the delay is our error, we absorb premium freight costs to recover the timeline where possible. If it's a material supply force majeure, we share the recovery plan transparently.
What we ask from customers: a realistic planned delivery date in the PO (not "ASAP" — that's not a date, it's pressure). And 24 hours' notice if your delivery destination or logistics agent changes — last-minute changes to export documentation are a real source of delay that both parties can avoid.
Qualifying us as an approved supplier is a structured process and we'll support every step of it. Most of our customers are large enough to have formal SQD (Supplier Quality Development) or SQE (Supplier Quality Engineering) functions, and we've been through enough qualification audits to know what's needed.
Standard supplier qualification package we provide: Company profile and ownership structure. Certificate of Incorporation (Indian registration). ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 certificates (current, issued by DQS). Facility details — floor area, equipment list, headcount. Key customer references (names with consent — we don't share contacts without agreement). A clear statement of what we do not hold: Brassland has no product approvals (WRAS, NSF, CE, WaterMark) — those belong to the company that places the finished product on the market. Sample quality performance data (DPPM, OTD, NCR trend). REACH and RoHS declarations. Modern Slavery Act compliance statement (for UK customers).
On request with NDA: Detailed process FMEAs for your specific product category. Customer-specific quality agreements (we're comfortable signing your standard SQA). A bank reference letter. Third-party inspection reports from recent orders.
Timeline for a full qualification: most customers complete our qualification in 4–8 weeks including a site visit. We've been qualified in as fast as 2 weeks for urgent project needs where the customer's SQE team focuses on it. The bottleneck is almost always the customer's internal approval routing, not our documentation responsiveness.
Where to go next
Brassland is a custom machining company supplying components to your drawing. These pages cover capability, quality and how to start.
What we do. Brassland is a custom machining company certified to ISO 9001, ISO 14001 & ISO 45001 (DQS). We machine components to your drawing and hold no product or regulatory approvals; certification, testing and final assembly of the finished product are the buyer's responsibility. Last reviewed: September 2026.
Need a specific answer?
Our engineering team responds to every enquiry within 24 hours.